GridBourse

BG

Data hub: what data each GridBourse site carries

Answer in brief

Each GridBourse site is meant to carry data no other site has. This page lists each site's data asset and its status, and shows the reference figures already sourced. Assets marked in preparation are not published yet; nothing is shown for them until it has a source and a date.

Data asset of each site

Data assets by site
SiteData assetSource familyStatus
gridbourse.comData-hub index and methodologyEach site's own sources, listed on the data hubPublished
buybessprojects.comProject stage ladder and buyer diligence checklistGrid operator and regulator procedures, linked per itemIn preparation
bessbulgaria.comRESTORE awardee and reserve-list trackerOfficial ranking on the EU-funds information system and Ministry of Energy noticesIn preparation
readytobuildsolar.comReady-to-build solar file checklistBulgarian permitting and grid-connection rules, linked per itemIn preparation
bestbessdevelopers.comDeveloper ranking with a stated public-data basisRESTORE awards and public operating-capacity reportsIn preparation
bessprojectspoland.comPoland grid-connection and substation watchPublications of the Polish transmission operator PSE, linked per itemIn preparation
batteriespeicherpacht.comLandowner lease checklist and grid request-versus-commitment dataBundesnetzagentur and SMARD publicationsIn preparation
selllandtodatacenters.comSeller readiness checklist and site-memo outlineGrid operator and planning rules, linked per itemIn preparation
datacenterlandeurope.comGrid-capacity and data-centre demand atlasTransmission operator and law-firm publications, linked per itemIn preparation

Reference figures already sourced

These figures are quoted as published and will be used on the sites named. Each has a link to its source; the dates are in the sources list below.

Reference figures
FigureValuePlanned forSource
Bulgaria, battery storage grants, round one: projects awarded82 projectsbessbulgaria.comBalkan Green Energy News, RESTORE round results
Bulgaria, round one: projects on the reserve list30 projectsbessbulgaria.comBalkan Green Energy News, RESTORE round results
Bulgaria, data-centre connection requests at the transmission operator9,330 MWdatacenterlandeurope.comCMS legal update, data centres in Bulgaria
Bulgaria, peak electricity consumption quoted for comparisonabout 7,000 MWdatacenterlandeurope.comCMS legal update, data centres in Bulgaria
Germany, storage connection requests in the latest full year reported18,158 requests, 573.5 GWbatteriespeicherpacht.comBundesnetzagentur / SMARD, storage connection requests and commitments
Germany, storage connection commitments in the same year1,937 commitments, 54.2 GWbatteriespeicherpacht.comBundesnetzagentur / SMARD, storage connection requests and commitments

How an asset gets published

What is unknown

Capacity actually free at each substation, asking prices and lease rents are not yet sourced. They are left out until a public source supports them.

Questions and answers

Why are most assets still in preparation?

A data asset is published only when its source has been read, checked against the robots rules and terms of the source site, and dated. Until then the site shows what is unknown.

Sources and as-of dates

Cite this page

Suggested citation:

GridBourse (A. Manchev EOOD). GridBourse data hub: the data asset of every site and reference figures. https://gridbourse.com/data/. Last updated: .