Answer in brief
If you are choosing where to source projects, do not set these three numbers side by side as if they measured the same thing. Bulgaria reports projects that won a grant: 82 projects (Balkan Green Energy News, RESTORE round results, ) in the first round and 31 projects (Ministry of Energy, notice on the second RESTORE procedure, ) in the second. Poland reports capacity by stage: 33.2 GW of storage discharge capacity with connection conditions issued and 22 GW with an agreement in force. Germany reports requests and commitments: 1,937 commitments (Bundesnetzagentur / SMARD, storage connection requests and commitments, ) in the latest full year.
So each figure answers a different question: who won money, who holds grid conditions, and who has a grid commitment. Ask the seller of any project which of the three it can show you in writing.
Your next step
You buy, invest or develop
Tell us which countries, sizes and stages you can act on, and we send you nothing that does not fit.
What happens to your enquiry →The three counts side by side
| Market and measure | What is counted | Figure | As at | Source |
|---|---|---|---|---|
| Bulgaria, RESTORE first round: awarded | Projects awarded a grant | 82 projects | Balkan Green Energy News | |
| Bulgaria, RESTORE first round: reserve list | Projects placed on the reserve list | 30 projects | Balkan Green Energy News | |
| Bulgaria, RESTORE second round: approved | Projects approved for funding | 31 projects | Ministry of Energy | |
| Bulgaria, RESTORE second round: reserve | Reserve-list proposals | 30 proposals | Ministry of Energy | |
| Poland, application in formal check | Storage discharge capacity | 0.9 GW | PSE | |
| Poland, application complete | Storage discharge capacity | 5.3 GW | PSE | |
| Poland, connection conditions issued | Storage discharge capacity | 33.2 GW | PSE | |
| Poland, agreement in force | Storage discharge capacity | 22 GW | PSE | |
| Germany, requests in the latest full year | Storage connection requests to network operators | 18,158 requests, 573.5 GW | Bundesnetzagentur | SMARD.de | |
| Germany, commitments in the latest full year | Storage connection commitments (Netzanschlusszusagen) | 1,937 commitments, 54.2 GW | Bundesnetzagentur | SMARD.de | |
| Germany, transmission-operator commitments so far in the current year | Commitments given by the transmission system operators (ÜNB) | 64 commitments, 24.7 GW | Bundesnetzagentur | SMARD.de |
We took the Bulgarian figures from the two sources named in the table, and the Polish figures from PSE's published list. The German figures are headline figures from the SMARD article of , quoted with attribution to Bundesnetzagentur | SMARD.de. We read that article on . SMARD's data-use page, which we opened on , carries a CC BY 4.0 notice, and we kept to the headline figures anyway: we do not reproduce SMARD's tables.
Bulgaria: who won a grant
The Bulgarian figures count projects that won RESTORE grant money. They say nothing about whether a project has a grid connection, has been built or is for sale. 30 projects (Balkan Green Energy News, RESTORE round results, ) sit on the first-round reserve list, and the second round has 30 proposals (Ministry of Energy, notice on the second RESTORE procedure, ) on its reserve list.
For you as a buyer, a grant is one input to the economics of a project. Before you rely on it, ask the seller for the award or reserve-list entry and for the grid-connection documents. Project-by-project detail is on the bessbulgaria.com tracker (detail, preview).
Round one: ISUN lists 82 awarded (read ), NetZeroLab 81 under implementation (). ISUN marks every row approved and gives no contract status, so we keep both. When a seller quotes either number to you, ask for the project's own row in the ranking and for its grant contract, then count nothing from memory.
Poland: where an application stands with PSE
PSE's list counts capacity, by the stage a connection application has reached. 5.3 GW (PSE, aggregated connection information, ) of storage discharge capacity is at the stage PSE calls complete, 33.2 GW (PSE, aggregated connection information, ) has connection conditions issued, and 22 GW (PSE, aggregated connection information, ) has an agreement in force. PSE gives these for the transmission and the distribution grids together.
The stage tells you how far an application has travelled, and a capacity figure does not tell you how many projects stand behind it. If a Polish seller says conditions are issued, ask for the document and read its validity date. PSE also publishes a list of switchgear with no free connection places: 33 stations (PSE, list of substations with no free connection places, ) on the list as at . Detail by voltage level is on bessprojectspoland.com.
Germany: requests and commitments
SMARD reports two counts for the latest full year: 18,158 requests (Bundesnetzagentur / SMARD, storage connection requests and commitments, ) storage connection requests with a combined 573.5 GW (Bundesnetzagentur / SMARD, storage connection requests and commitments, ), and 1,937 commitments (Bundesnetzagentur / SMARD, storage connection requests and commitments, ) commitments with a combined 54.2 GW (Bundesnetzagentur / SMARD, storage connection requests and commitments, ). For the current year, SMARD gives 64 commitments (Bundesnetzagentur / SMARD, storage connection requests and commitments, ) commitments from the transmission operators alone, 24.7 GW (Bundesnetzagentur / SMARD, storage connection requests and commitments, ), as at .
These count requests to network operators, and a request is not a project. Several requests can describe the same site, and we know of no source that matches requests to projects, so we draw no conclusion about how many sites are behind them. A commitment is the grid company's answer to a request. Ask a German seller for the commitment itself, issued by the grid company named in it.
What to ask before you rely on any of these
- Which of the three do you hold in writing: a grant award, connection conditions, or a connection commitment or agreement? Ask for the document.
- Which grid company issued it, for which site, and what date does it carry? Check the validity period against your timeline.
- Does the capacity in the document match the project you are being offered, and is the document in the name of the project company you would buy?
- Who else has applied at the same substation? None of the three public sources shows this, so ask the grid company.
We publish no prices, no valuations and no ranking of the three markets: the sources do not support one.
Download the files
Files: storage-grid-pipeline.csv and storage-grid-pipeline.json, both UTF-8. They hold the figures read up to . The files are rebuilt whenever one of the figures changes, and the date moves with them.
Reuse and attribution, by source
- Bulgaria (Balkan Green Energy News, Ministry of Energy, round II notice; read on ): We have not confirmed reuse terms for either source. The file carries the figure, the source name and the link.
- Poland (PSE; read on ): We found no licence statement on PSE's pages when we checked on . The file carries figures only, with the link, and none of PSE's documents.
- Germany (Bundesnetzagentur | SMARD.de; read on ): SMARD's data-use page, read on , carries a
CC BY 4.0notice. We take headline figures only and credit Bundesnetzagentur | SMARD.de.
Fields
| Field | Type | Meaning |
|---|---|---|
row_id | integer | Row number in the file. |
market | string | Bulgaria, Poland or Germany. |
measure | string | The official count the row belongs to. |
stage | string | Stage or kind of count within the measure (PSE's own stage name for Poland). |
what_is_counted | string | What the figure counts. Counts, capacities and requests are different units; rows are not additive. |
value | number | The figure as the source states it. |
unit | string | projects, proposals, requests, commitments or GW. |
as_of | string | Reference date or year the source gives. Empty where the source gives none. |
source_label | string | Name of the source document. |
source_url | url | Address of the source. |
retrieved | date | Day we read the source. |
attribution | string | Whom to credit for the figure. |
reuse | string | What we found about reuse terms, and what the file therefore carries. |
The unit column uses projects, proposals, requests, commitments, GW. Add them up and you add different things; filter by unit before you compute anything.
Cite this dataset
GridBourse (A. Manchev EOOD). Storage grid-connection figures: Bulgaria, Poland and Germany. Version . https://gridbourse.com/data/storage-grid-pipeline-bulgaria-poland-germany/. Sources: Balkan Green Energy News, Ministry of Energy of Bulgaria, PSE, Bundesnetzagentur | SMARD.de.
@misc{gridbourse_pipeline,
author = {GridBourse (A. Manchev EOOD)},
title = {Storage grid-connection figures: Bulgaria, Poland and Germany},
year = {2026},
note = {Version 2026-11-15},
url = {https://gridbourse.com/data/storage-grid-pipeline-bulgaria-poland-germany/}
}
Tell us what you want to buy
If you source storage projects in one of these countries, tell us the countries, size range and stages you can act on. We read every enquiry ourselves, and we share nothing without your agreement.
Questions and answers
Why does the file have no total across the three countries?
The rows count projects, capacity by stage, requests and commitments. Those are different things, so a total would mislead you.
Can I use the German figures commercially?
SMARD's data-use page states CC BY 4.0, which asks you to credit Bundesnetzagentur | SMARD.de. Read the licence text yourself before you rely on that for your own use.
Where do the full tables live?
At the source. The file carries headline figures and the address of the document each one comes from.
Why not compare the three countries directly?
Bulgaria counts projects with a grant, Poland counts capacity by application stage, and Germany counts requests and commitments. The units and the question behind each differ, so a side-by-side ranking would mislead you.
Does a grant, a set of connection conditions or a commitment mean the project will be built?
No. Each is one document in a chain. Ask the seller which ones they hold and read their dates.
Where does each figure come from?
Every figure links to its source with the date we read it: Balkan Green Energy News and the Bulgarian Ministry of Energy for RESTORE, PSE for Poland, and Bundesnetzagentur | SMARD.de for Germany.
Do you sell projects or give advice on which market to pick?
No. We give no valuations and no investment, legal or tax advice. We read your enquiry ourselves and decide case by case whether an introduction makes sense. A fee, if one ever applies, is agreed with you in writing before any name is shared.
Sources and as-of dates
- Balkan Green Energy News, RESTORE round results: balkangreenenergynews.com, retrieved .
- PSE, aggregated connection information: pse.pl, retrieved .
- Bundesnetzagentur / SMARD, storage connection requests and commitments: smard.de, retrieved .
- Ministry of Energy, notice on the second RESTORE procedure: me.government.bg, retrieved .
- Bundesnetzagentur / SMARD, storage connection requests and commitments: smard.de, retrieved .
- ISUN, RESTORE round-one ranking:
2020.eufunds.bg, retrieved . - NetZeroLab, Sofia University: netzerolab-feba.bg, retrieved .
- PSE, list of substations with no free connection places: pse.pl, retrieved .