Selling a storage or solar project? Put these facts on one page before a buyer has to ask

For owners and developers of battery, solar and hybrid projects. Download the template, fill it in on your own computer, and send it to a buyer yourself or to us.

Send us your project

Answer in brief

A buyer or fund needs the same few facts to judge whether your project fits: where it is, how large it is, which document proves its stage, and what the grid operator or ministry has put in writing. The memo template holds exactly those fields and nothing else. It needs no project name, no plot number and no price. Download it, fill it in with a text editor, and keep it ready. If you want us to read the project, copy the fields into the seller form.

Your next step

Your memo is filled in

Paste the fields into the seller form. We read it ourselves and share nothing without your agreement.

Send us your project

What happens to your enquiry →

Download the memo template

Download the template (Markdown)

The file is plain text. Downloading it sends us nothing, and filling it in collects nothing: it stays on your computer until you decide to send it.

Field by field: what to write and what a buyer holds it against

The memo fields, what goes in each and what a reader can check it against
FieldWhat you writeWhat a reader checks it against
CountryThe country where the project connects to the grid.The official count that applies there: the RESTORE lists in Bulgaria, the PSE connection stages in Poland, the SMARD requests and commitments in Germany. The table below lists their words.
MW and MWhThe megawatts exactly as the connection document states them. Give storage energy in MWh on its own line.The capacity printed in your grid document. PSE counts capacity, so a figure that differs from your document stands out at once.
StageThe stage named by the latest paper you can show, from land only up to operating.The document you list under grid status. A stage you cannot back with a paper invites questions.
Location or substationMunicipality or region. Add the substation if you know it; leave it empty if you do not.The connection point in the grid document.
Grid statusThe exact word of the document you hold, the issuer, the date and the validity.The grid operator's own wording, which differs by country (next table).
Asking priceOptional. Leave it blank if you have none.Nothing: we publish no asking prices and give no valuation, so the field only records your own expectation.
CompanyThe project company that holds the documents.Whether the grid document is issued to the company you would sell.

Grid status: the words each country's official count uses

Write the status in the words of the document you hold, not in a summary of your own. The three markets count different things, so the same project can sit in different boxes depending on where it is.

Status words and the official figure behind each, with its source and the day we read it
MarketStatus wordsOfficial figureSource and read date
Bulgaria, RESTORE first roundFunded (in the official ranking) or on the reserve list82 funded, 30 on the reserve listISUN, RESTORE round-one ranking,
Bulgaria, RESTORE second roundApproved for funding, reserve list or rejected31 approved, 30 reserve, 3 rejectedMinistry of Energy, RESTORE second-round lists,
Poland, PSEApplication in formal check; application complete; connection conditions issued; agreement in forceStorage discharge capacity: 0.9 GW in formal check, 5.3 GW complete, 33.2 GW with conditions issued, 22 GW with an agreement in forcePSE, aggregated connection information,
Germany, Bundesnetzagentur and SMARDConnection request; connection commitment (Netzanschlusszusage)Latest full year: 18,158 requests and 1,937 commitments for storageBundesnetzagentur / SMARD, storage connection requests and commitments,

Round one: ISUN lists 82 awarded (read ), NetZeroLab 81 under implementation (). ISUN marks every row approved and gives no contract status, so we keep both.

These are counts of different things: projects with a grant, capacity by application stage, and requests with commitments. Do not add them up, and do not write a figure from this table into your memo as if it described your project. They tell you which words a buyer in that market expects to see.

If your project is on a RESTORE list

The first round reads by rank: projects up to rank 82 are funded, and the reserve list runs from rank 83 to rank 112 (ISUN, RESTORE round-one ranking, ). In the second round the Ministry published three lists and no ranking by place. So write the round, the list and, where there is one, your place in it. Name them and attach the entry for your project. Do not expect a buyer to look up a delivery status for you: of 173 funded and reserve rows we checked in the Ministry of Energy's RESTORE section (read on ), 0 carry a delivery status taken from a Ministry document. What you can show about your own project is the document you hold.

Check the memo against your own papers

  1. Open each document you list and copy the capacity from it. If two documents give different megawatts, say which one governs and why.
  2. Read the name of the company the document was issued to. If it is not the company in the memo, fix one or the other before you send it.
  3. Look at the validity date of every document. Write it down; do not round it to "valid".
  4. Leave out whatever you cannot back with a paper. An empty field costs less than a field a buyer disproves.

After you have filled it in

Approach buyers yourself and the memo is yours to use as you like. Want us to read it? Paste the same fields into the seller form.

We give no valuations and publish no asking prices.

Questions and answers

Does the template ask for the project name or the plot?

No. It asks for a municipality or region and, if you know it, the substation. Names and plot numbers can wait until you decide to show the project to a buyer.

Does filling in the template send you anything?

No. It is a text file on your own computer.

My project has no grid document yet. Can I still use the memo?

Yes. Choose the stage that is true, write in the grid-status field what you have applied for and on what date, and leave the rest blank.

Sources and as-of dates

  1. ISUN, RESTORE round-one ranking: 2020.eufunds.bg, retrieved .
  2. Ministry of Energy, RESTORE second-round lists: me.government.bg, retrieved .
  3. PSE, aggregated connection information: pse.pl, retrieved .
  4. Bundesnetzagentur / SMARD, storage connection requests and commitments: smard.de, retrieved .
  5. NetZeroLab, Sofia University: netzerolab-feba.bg, retrieved .
  6. Ministry of Energy, RESTORE section: me.government.bg, retrieved .
  7. Ministry of Energy of Bulgaria, RESTORE section me.government.bg, retrieved .