Answer in brief
If the station next to your land is on PSE's list of switchgear with no available connection places, PSE shows no free place there at the voltage in that row. Ask whoever offers you a lease or a purchase how the project connects at that station. If the station is not on the list, you still do not know that it has room: ask the grid company in writing. Every row is further down, each with its source and date.
Your next step
You own land or a project near a PSE station
Give us the station symbol and the location, and we check the station against the current PSE list.
What happens to your enquiry →Three results, three next steps
- Your station is on the list, at your voltage. Put one question to the developer or buyer, in writing: at which switchgear and on what date does the project connect? Do not discuss rent or price until you have the answer.
- Your station is on the list, but only at another voltage. Check which voltage your project connects at. The last column of each table shows the other voltages the same symbol has on the list.
- Your station is not on the list. That is no sign of room. Ask the grid company in writing whether a connection place is free, and give it the symbol, the voltage and the size of the project.
Landowner or project owner: the question changes
If you own land, the question you carry to a developer is whether the project can connect at all. If a developer will not answer it in writing, ask yourself what you are holding your land for. If you own the project, the question you carry to a buyer or a bank is the same one turned round: which switchgear, which voltage, which written reply from the grid company.
In both cases the station symbol is the key. With it you can read one row below, write one precise letter and compare any two offers on the same footing. Without it, every conversation about rent, price or timing rests on a station nobody has named.
What to put in your written question
- The station symbol from the table, and the voltage you were quoted.
- Where the plot or the project is, and how far it is from the station.
- What you want to connect: solar, battery storage or both, and the size in megawatts.
- A request for the answer in writing, so you can show it to a buyer, a bank or a lawyer.
Tell us about your land
Send us the plot and the station symbol, and we look the station up against the current PSE list ourselves. We tell you plainly what we could not confirm, and we share nothing without your agreement. Selling a project instead? Use the seller form.
Every row of PSE's list
We counted the rows ourselves: one row for each station and voltage on the list, 37 in all at 33 stations. Count the rows below and you get the same figures; a symbol that appears at two voltages counts once as a station. The list is dated ; check PSE's connection pages for a newer one before you decide anything.
400 kV: 5 rows
| Station symbol, source and date | Voltage | Same symbol at another voltage |
|---|---|---|
| CHS (PSE, list of substations with no free connection places, ) | 400 kV | none |
| GDA (PSE, list of substations with no free connection places, ) | 400 kV | 220 kV, 110 kV |
| MSK (PSE, list of substations with no free connection places, ) | 400 kV | none |
| OST (PSE, list of substations with no free connection places, ) | 400 kV | none |
| WRC (PSE, list of substations with no free connection places, ) | 400 kV | none |
220 kV: 28 rows
110 kV: 4 rows
| Station symbol, source and date | Voltage | Same symbol at another voltage |
|---|---|---|
| GDA (PSE, list of substations with no free connection places, ) | 110 kV | 400 kV, 220 kV |
| GOR (PSE, list of substations with no free connection places, ) | 110 kV | 220 kV |
| MOR (PSE, list of substations with no free connection places, ) | 110 kV | 220 kV |
| PRG (PSE, list of substations with no free connection places, ) | 110 kV | none |
PSE prints a short symbol for each station, and we show it exactly as printed. We add no station names, because we cannot back them with the list.
Questions and answers
How do I find my station's symbol?
Ask the grid company or the developer for it in writing, and match it to the symbol in the tables. If you only have a station name, do not guess: get the symbol from the grid company.
My station is on the list. Is my land worthless?
We cannot say that. We hold no source on land value, and a row says nothing about rent or price. It tells you to ask how the project connects.
My station is not on the list. Can I build there?
The list does not answer that. Ask the grid company in writing and keep its reply.
How current is this?
The rows are PSE's list dated . We read it again when we refresh our data, and every row shows the day we read it.
Do you give rent or price figures?
No. We have no dated source for them, so we publish none.